What We Do

Services

A full rundown of the deck work on offer, from new builds to board repairs.

Home › Services

Everything we take on

Every job below is one we do ourselves across Punta Gorda.

Deck Installation

Framing in pressure-treated southern yellow pine, joists set to the span table for your decking material, footings poured below grade for stability. Ledger boards get bolted and flashed to the house, not just nailed, since that connection is where most deck failures start.

Composite Deck Installation

Trex and TimberTech go down over a standard pressure-treated frame, using hidden fastener clips instead of face screws for a cleaner look. Composite costs more upfront than wood but doesn't need re-staining and holds up better to Florida humidity.

Deck Repair

Soft spots, popped nails, a ledger board separating from the house wall, or a railing that's gone loose. We pull the damaged section, check the joists underneath for rot or termite damage, and repair what's actually failing instead of just covering it.

Deck Staining & Sealing

Pressure wash first, strip any failing old finish, then let the wood dry out for a couple of days before sealing. A UV-rated sealer holds up better against Florida sun than a basic clear coat, especially on a south-facing deck.

Custom Deck Design

Multi-level layouts, decks built around an existing pool or oak tree, picture-framed border boards, built-in bench seating along a rail line. Layout decisions get made before the first footing goes in, since changing direction mid-build costs more than planning it up front.

Deck Railing Installation

Florida code sets a minimum rail height and a baluster spacing that passes the 4-inch sphere test, and we build to that regardless of material. Aluminum, wood and cable rail all have different post spacing requirements, which affects how the frame underneath gets built.

Pool Deck Building

Decking built around an existing pool cage, graded so water drains away from the house instead of pooling against it. Non-slip composite boards are the common choice here since bare feet and wet surfaces don't mix well with standard wood.

Deck Board Replacement

Spot-replacing cupped, split or splintering boards without tearing out the whole deck. Matching the color of weathered wood or composite takes some judgment, and we'll tell you up front if a few new boards are going to stand out.

Screened Porch Addition

Extending a deck into a screened lanai, which usually means a heavier footing schedule to carry roof load and tying new framing into the existing roofline. This is a bigger job than standard decking and runs on its own permit and inspection.

Deck Demolition and Removal

Tearing out an old wood deck before a rebuild, hauling off the scrap lumber, and checking whether existing footings are sound enough to reuse. Reusing good footings saves money, but a lot of older decks in this area were never poured deep enough to begin with.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Punta Gorda, FL

Deck installation and repair work covers Charlotte County and beyond.

Punta Gorda, FL
Cape Coral, FL
Lehigh Acres, FL
Fort Myers, FL
North Port, FL
Port Charlotte, FL
Sarasota, FL
Venice, FL
Englewood, FL
Arcadia, FL
Rotonda West, FL
Boca Grande, FL
Common Questions

Things worth asking

Questions that come up once a deck project is underway.

Do I need a permit to build a deck?
Charlotte County requires a permit for most decks over 30 inches off the ground, with an inspection scheduled once the footings and framing are in, before the boards go down. Decks attached to the house also trigger a review of the ledger board connection, a common failure point.
How long does a deck project take from start to finish?
A standard single-level deck around 300 to 400 square feet usually takes one to two weeks from footings to final board, weather permitting. Composite decking with hidden fasteners takes slightly longer to install than standard wood decking since the clip system is slower per board.
Can a deck be built to a set budget?
Pressure-treated pine keeps cost down compared to composite, and simplifying the railing style or skipping a multi-level design brings the number down further. A detailed quote should show where the money goes so cuts can be made to the design rather than to the footings or framing.
Is deck construction work guaranteed?
Workmanship on framing, decking and railing is typically covered for a set period after completion, separate from the manufacturer's warranty on composite boards or hardware. Ask specifically what's covered, since a materials warranty doesn't cover installation mistakes and vice versa.
Who do I deal with once a deck project is underway?
On most deck jobs, one person runs the site day to day, usually the lead carpenter, and that's the point of contact for progress or changes. Decisions about change orders, like adding stairs or a bench, go through that same person rather than getting lost between crew members.
What decking materials are typically used?
Pressure-treated southern yellow pine is the standard for framing regardless of what decking material sits on top, since it holds up to Florida humidity when properly sealed. For the decking itself, options run from pressure-treated pine to composite brands like Trex and TimberTech, which cost more but skip the re-staining.
Do I need to move out of the house during deck construction?
Deck construction doesn't usually require leaving the house, since the work happens outside and the ledger board connection only takes a day or two of that. Expect some noise from saws and nail guns during daytime hours, and keep pets away from the work area for safety.
How should the site be prepared before deck work starts?
Clearing furniture, grills and potted plants off the existing deck or patio area before the crew arrives saves setup time on day one. Marking sprinkler lines and underground utilities in the yard matters too, since footings get dug below grade.
What happens if rot or damage turns up once the old deck comes up?
Finding rotted joists, a failing ledger board or termite damage once old decking is pulled up is common on repair and rebuild jobs, and it gets flagged before any new material goes down. Pricing for that additional repair should be agreed on before work continues, not billed as a surprise afterward.
How should a finished deck be maintained?
Wood decking takes a fresh coat of sealer every one to two years in Florida's sun and humidity, longer if a UV-rated product was used. Composite decking just takes periodic washing to clear mildew and pollen, and hardware should get checked once a year for rust or loosening, especially near the coast.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (941) 292-6425